Projects of Previous Years

Customer

Services

Year of performance

Sites of the Republic of Belarus

JSC “Mozyr Oil Refinery”

1

JSC “Mozyr Oil Refinery”

Sulfur-alkali wastes utilization unit of the shop No.10

in development

2

Hydrocracking complex of heavy petroleum residues. Off-plant facilities

in development

3

Design of utility networks and systems of JSC “Mozyr Oil Refinery” for the period of 2013-2017 (Interconnections, Power Supply, Water Supply and Sewage, Ventilation Systems)

in development

4

Construction of new regional condensate station in the shop No.5 commodities

2017

5

Development of plot plan as a Designer (2013-2017)

2016

6

Reconstruction of heating direct water system of tank batteries of the section of dark oil products of the shop No.5

2016

7

Reconstruction of inert gas unit (Nitric-acid station) of the shop No.12

2016

8

Sulfur production plant (Sulfur-2). Off-site facilities, process interconnections and utility networks in JSC “Mozyr Oil

Refinery”

2015

9

Replacement of outdated equipment of APCS of light hydrocracking unit

2013

10

Reconstruction of solid sulfur open storage

2013

11

Off-plot facilities for newly constructed units: isomerization; hydrodesulfurization; hydrotreatment; hydrogen production

2012

12

Modernization of gasoline mixing station

2011

13

Off-site facilities of monoethanolamine regeneration of sulfur production unit

2011

14

Automated unit of light-oil products timing loading

2009

15

ZAO Neftekhimproject Russia

Hydrocracking complex of vacuum gasoil. Off-plant facilities.  JSC "Mozyr Oil Refinery"

2017

16

Composite plant for production of high-octane number components of gasoline. Off-plant facilities.

2011

17

Engine fuel production complex. Off-plant facilities.

2010

18

Monoethanolamine regeneration unit of Sulfur production plant. Engineering equipment, networks and systems

2009

OJSC “Naftan”

19

OJSC “Naftan”

Construction of storage park and LPG filling rack

in development

20

Construction of Delayed Coking Unit

in development

21

Modernization of steam supply objects of the production No. 7

2017

22

Reconstruction of flare gases return system "GАRO"

2016

23

Flare System Unit for the unit AT-8

2016

24

Construction of the park of additives for diesel fuel 921-08

2009

25

STS Integrirani tehnicki servisi d.o.o. Croatia

Reconstruction of hydro treatment unit L-24/7 of JSC “Naftan”

2010

26

Reconstruction of hydro treatment unit LCh-24/7 of JSC “Naftan”

2010

27

Construction of low temperature isomerization with deizohexanization of JSC “Naftan”

2008

28

ITP Benelli S.p.A ITP

Italy

Reconstruction of vacuum block of primary oil refining ELOU-AVT-2 OJSC “Naftan”

2014

29

Technip Benelux B.V. The Netherlands

Hydrogen production plant OJSC “Naftan”

2017

30

CJSC "Honeywell" Russia

Gazoline mixing station in commodities shop No.8 OJSC “Naftan”

2012

31

Plant "Polymir" JSC "Naftan"

Reconstruction of internal and external hydrotransport system of the shop 105 and mixing department of the shop 106

in development

32

Shop 007. Construction of liquid ammonia storage

2014

JSC “Grodno Azot”

33

JSC “Grodno Azot”

Construction of nitric acid shop with the capacity of 1200 tons per day with the reconstruction of acting production of carbamide-ammonia mixture. Off-plot facilities

in development

34

Replacement of control, management and ESD system of the shop ammonia-3 with the distributed control system

2014

35

Experimental and technologic work “Reconstruction of ammonia-4 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop

2014

36

JSC “Grodno Azot”

Experimental and technologic work “Reconstruction of ammonia-3 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop

2014

37

Recycling of X-oils of the shop of fractionation of cyclohexanone-1 shop. Stage of the recovery of cyclohexanol-rectificate (of the column 534 А/В) of the shop cyclohexanone-1

2011

38

Intensification of the stage of benzol distillation of caprolactam-1 shop

2011

39

Reconstruction of neutralization stage of caprolactam-1 shop

2011

40

Reconstruction of the unit of cyclohexanonoxima and cyclohexanone stripping from the ammonia sulfate solution of oximation stage of the shop caprolactam-1

2011

41

Reconstruction of caprolactam water solution evaporation stage of the shop caprolactam-1

2011

42

Reconstruction of cyclohexanol-rectificate recovery unit of the shop cyclohexanone-2

2011

43

Reconstruction of distillation stage of caprolactam of caprolactam-1 shop

2011

44

Construction of steam turbine-generator train with electric power 5,12 Mwatt for the replacement of pressure-reducing cooling stations (PRDS) k.3014

2011

45

Reconstruction of the shop for the production of dimethyl ether of fatty acids with the increase of the production up to 30 KTA

2010

46

Construction of granulated carbamide-6 production shop

2009

47

Construction of gas-turbine station of cogeneration cycle of second stage (GTPP-16Mwatt, 2х8Mwatt).1st start-up complex

2009

48

Reconstruction of carbamide-3 shop with the transfer to the release of granulated carbamide

2009

49

Replacement of control and power supply systems SZhA-3,4 of shop ammonia-3

2009

50

Modernization of the control system and emergency protection of ammonia-3 shop

2008

51

TKIS-RUS Russia

Construction of the nitric acid shop with the capacity of 1200 ton per day with the reconstruction of existing production of carbamide-ammonia mixture

2016

52

Chemieanlagenbau

Chemnitz GmbH

(CAC) Germany

Reconstruction of process system No.1 of oleum shop with transfer to short diagram in “JSC “Grodno Azot”

2016

53

Koch-Glitsch Italy

Reconstruction of rectification of the shop cyclohexanone-2 JSC “Grodno Azot"

2009

54

AB “BIPROZAT” Poland

Unit 280 cyclohexane oxidation unit with capacity of 80 000 t/year JSC “Grodno Azot”

2008

JSC “Belshina”

55

JSC “Belshina”

Main building superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 25" - 29"

in development

56

Main building of mass tires plant. Overheated water circuits for hydraulic presses of the tunnels No.5 and No. 7

2017

57

Main building of superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63.

2017

58

Main building of superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63. Reconstruction of stock preparation shop

2016

59

Main building of superlarge overall dimensional tires plant. Reconstruction of stock preparation shop No.1

2016

JSC “Gomel Chemical plant”

60

JSC “Gomel Chemical plant”

Reconstruction of 2nd section of phosphorus acid shop with bringing up the capacity up to 220 KTA

2014

61

Reconstruction of phosphorus acid shop with bringing up the capacity up to 230 KTA

2011

62

Modernization of the equipment of sulfuric acid shop No.2 (SKC-2)

2009

JSC “Mogilevkhimvolokno”

63

JSC “Mogilevkhimvolokno”

Complex for polyether production. 1st stage of the construction. Reconstruction of chemical shop No.2 of organic synthesis production with the arrangement of polyether fiber by means of direct molding

in development

64

Process unit for the production of methyl ethers of fatty acids 50000 t/year

2013

65

Reconstruction of offsite electrical power generating plants.

2011

66

Needle-punched and thermally bonded nonwoven fabrics production line in the synthetic fiber plant

2010

67

Unit of continuous polycondensation with the capacity of 80 000 t/year

2008

68

JSC “Mogilevkhimvolokno”

Shop for the production of the basis of roofing material

2008

69

Unit for the production of high-tenacity yarns of HМ and HMLS types

2007

 

State Production Association “Belorusneft”

 

70

State Production Association “Belorusneft”

Complex reconstruction of the Belarusian Gas Processing Plant

2015

71

Reconstruction of vapor supply system of the Belarusian Gas Processing Plant

2015

72

Reconstruction of compressed gas unit of the Belarusian Gas Processing Plant

2012

73

Construction of ware-raw area No. 2 of the Belarusian Gas Processing Plant

2009

74

Reconstruction of electric power supply system of process objects of the Belarusian Gas Processing Plant.

2009

 

JSC "Mineral Wax Plant"

 

75

JSC "Mineral Wax Plant"

Construction of new and reconstruction of operating productions with the application of modern automated technologies

2016

76

AB “Prochem” Poland

Production of highly purified lampwax with the capacity of 20 000 t/year. JSC “Mineral Wax plant”

2016

 

JSC “Lakokraska”

 

77

MAVEG

Industrieausrüstungen

GmbH, Germany

Technical re-equipment of phthalic anhydride production with increase of capacity up to 48 thousand tons per year. Construction of the shop of distillation and process train “А” JSC “Lakokraska”

2016

 

Other sites of the Republic of Belarus

 

78

JSC “Mozyrsol”

Modernization of drying shop of main building of salt production

in development

79

KUP “Kalinovichsky plant for household chemicals”

Reconstruction of KUP “Kalinovichsky plant for household chemicals”

2010

80

RUE

“Grodnoobnefteproduct

Reconstruction of oil tank farm

2013

81

FLLC “Omsk Carbon

Mogilev” Mogilev

Creation of the enterprise for technical carbon production in free economic area “Mogilev” Mogilev district Mogilev region and railway access to it

in development

82

RUE "Svetlogorsk Khimvolokno"

Reconstruction of nonwoven materials shop

2009

83

Reconstruction of Arselon fiber production

2008

Site outside the  Republic of Belarus

 The Republic of Lithuania

84

AB "Achema"

Revamp of ammonia-2 shop. Implementation of saturation unit of natural gas; ammonia condenser unit in the part of secondary condensation.

in development

85

Replacement of ammonia heater on the nitrogen acid unit

2017

86

Modernization of air automation K-500 No.2 of ammonia water shop

2016

87

Instrumentation system replacement of unit АС-67А of ammonia nitrate

2016

88

Unit UKL-7 of non-concentrated nitric acid shop. Replacement of fuel valves block of the unit UKL-7 GTT-3/3 М of nonconcentrated nitric acid production. Unit No.3

2016

89

Revamp of ammonia production-1 in one set with:

  1. "Revamp of air compressor pos. 402";
  2. "Revamp of natural gas compressor pos. 403, installation of dry sealing and pressure reduction spool";

   3.  "Revamp of process condensate diagram of the shop “Ammonia-1”

2015

90

Production of nitric acid of the shop GP-2.

2014

91

Revamp of ammonia unit-1 (АМ-70). Instrumentation and connection of DCS and ESD

2012

92

UAN production AB “Achema”

2010

93

Instrumentation system replacement of units UKL-7 No. 3,6 with PCS

2009

94

Production of non concentrated nitric acid in UKL units No. 7, 8, 9

2003

95

UAB “Iremas” Lithuania

Replacement of Instrumentation system of units No. 1,2 with PCS of carbamide shop” .

2016

 The Russian Federation 

96

ZAO "Neftekhimproekt"

Reconstruction of straight-run fuel plant ZPT-450 LLC “Volkhovneftekhim” . Off-plant facilities.

2016

97

Off-plot facilities of Hydrogen production plant JSC “Orknefteorgsyntez”

2014

98

JSC “Acron” Russia

Replacement of Instrumentation system of nitric acid shop of 1 stage with DCS system

2009

99

Research and

Production firm

“Grace-Engineering”

Dry gas-dynamic sealing unit for compressors of hydrogen containing gas 2 CD-43/50-64М pos. CK-301 of the unit LK-6U

2009

100

JSC "ShchekinoAzot"

The shop of hexamethylenetetramine, carbamide-formaldehyde concentrate. Technical re-equipping

2012

101

Reconstruction of caprolactam production oxidation shop for improvement of TEP

2011

102

LLC “Design Institute

“SGNHP” Salavat Russia

Catalytic cracking complex with the capacity of 1095 KAT Oil Refinery “Gazprom neftekhim Salavat”. Intermediate park for storage and supply of liquified petroleum gases”

2016

103

АО "Phosagro AG"

Design documentation “Objects of infrastructure of ammonia production  with the capacity of 2200 tons per day JSC “Phosagro-Cherepovets”

2015

104

Further equipping of convectional area of primary reforming pos.107 by the heat exchanger (recuperative heat exchanger) of natural gas pos.R-1 in the ammonia production shop No.2

2014

105

Joint-stock company “Cherepovetsky Azot” Russia

Technical re-equipment of ammonia production shops No.1 (TEC), and No.2  (AM-76)

2012

106

Balakovsky branch of Joint-stock company “Phosagro AG” Russia

Construction of NPK fertilizers production with the capacity of 450 KAT in LLC “BMU” (Balakovsky plant of mineral fillings)

2014

107

АО NAK"Azot"

Technical re-equipment of SAC section of the shop of nitric acid production with the creation of automated control system APCS

in development

108

Replacement of the control system of Borsig compressor in the shop Carbamide-2

2014

109

Technical re-equipment of ammonia nitrate shop MUiK No.1 with the transfer to PCS

2012

110

Replacement of the control system of nitric acid separation of the shop MUiK No. 1 with automatic control system of technological process

2009

111

JSC "Nevinnomyssky Azot"

Technical re-equipment of APCS and PAZiS system of vinyl acetate production in the shop No. 12

in development

112

Technical re-equipment of automatic process control system (APCS)  of the shop No.12А

2017

113

Creation of the system of control and emergency protection over air and nitric compressors of the shop No.11 PRV, ZHUiOA

2015

114

Creation of APCS in the section of acetic aldehyde of the shop No.9

2014

115

JSC "Nevinnomyssky Azot"

Technical re-equipment of APCS UTO of the shop No.12 with the application of microprocessor technology and the transfer of central processing unit from the building 819 to the building 821

2013

116

Modernization of Instrumentation means with implementation of PCS of complex mineral fertilizers production shop No.18

2010

117

LLC "Scientific and technological center" Khimazot "

Technical re-equipment of UKL-7-76 for the production of nitric acid based on the selective treatment of tail gases” JSC “Meleuzovskie mineral fertilizers”

2014

118

Technical re-equipment of tail gases treatment with the transfer to the selective treatment  of the section 5-A of the shop MUiK No. 1

2011

119

Waste disposal of nitrous gases of nitric acid (KAK) of the shop MUiK No.2 “NAK Azot”

2010

120

Technical re-equipment of the unit UKL-7 No.3 with the unit GTU-8 and evaporative system of air cooling at discharge GTU-8 in the shop No.5 of nitric acid production

2009

121

Technical re-equipment of nitrous gases preparation stage of the unit AK-72 М

2009

122

Technical re-equipment of the nitrous gases preparation stage in the unit AK-72

2009

123

ITC"Himazot-SPB"

Technical re-equipment of the stage of recuperative heating of tail gases before the reactor of selective treatment of the unit UKL-7-76 No.8 for the production of nitric acid in JSC “PhosAgro-Cherepovets”

2016

124

Working documentation for the replacement of existing Instrumentation means of ammonia evaporation unit for units UKL 7-76 No.1, 3 and the unit of steam supply to UKST for the unit No.1 in JS “Meleuzovsky mineral fertilizers”

2015

125

Technical re-equipment of units UKL-7-76 No. 1, 3 for the nitric acid production on the basis of selective catalityc treatment of tail gases” on LLC “Mendeleevskazot”

2014

126

CJSC "Honeywell" Russia

Modernization of the production of Astrakhan Gas Processing Production for the purpose of production of motor fuels of 4th, 5th classes

2014

127

JSC "KuibyshevAzot" Russia

Polyamide-6 production plant.

2016

128

JSC "KuibyshevAzot" Russia

Ammonia production. Technical re-equipment of Instrumentation system without  the alteration of the process part of the project

2008

129

JSC “Tulagiprokhim” Russia

Documentation for the section of production engineering automation for the object “Technical re-equipment of units UKL-7 No.1-9 with the unit GTU-8 in the section of non concentrated nitric acid of the shop MUiK No.1 in JSC “NAK “Azot”. Unit No.5.

 

2015

130

IPS “Invensys Process

Systems” Russia

Replacement of Instrumentation system of unified standard lines 7-71/76 UKL (3 units) and general shop measurement of the shop of SAK JSC “Dorogobuzh” with APCS

2012

131

JSC “Dorogobuzh”" Russia

Documentation for replacement of Instrumentation system (instrumentation and automated control systems) of units AK-72 (2 units) and general shop measurement of the shop of SAK (weak nitric acid) to APCS (process control system)

2016

132

JSC “TIAP” Russia

Technical re-equipment of the control system of ammonia unit No.6 in JSC “TogliattiAzot” (unit AM-76). 1st stage, videlicet – Technical assignment for APCS and main technical decisions

2014

133

JSC “Acron” Russia

Replacement of the Instrumentation system of nitric acid shop 1 stage with PCS system

2009

 

Top