Projects of Previous Years
№ |
Customer |
Services |
Year of performance |
Sites of the Republic of Belarus |
|||
JSC “Mozyr Oil Refinery” |
|||
1 |
JSC “Mozyr Oil Refinery” |
Sulfur-alkali wastes utilization unit of the shop No.10 |
in development |
2 |
Hydrocracking complex of heavy petroleum residues. Off-plant facilities |
in development |
|
3 |
Design of utility networks and systems of JSC “Mozyr Oil Refinery” for the period of 2013-2017 (Interconnections, Power Supply, Water Supply and Sewage, Ventilation Systems) |
in development |
|
4 |
Construction of new regional condensate station in the shop No.5 commodities |
2017 |
|
5 |
Development of plot plan as a Designer (2013-2017) |
2016 |
|
6 |
Reconstruction of heating direct water system of tank batteries of the section of dark oil products of the shop No.5 |
2016 |
|
7 |
Reconstruction of inert gas unit (Nitric-acid station) of the shop No.12 |
2016 |
|
8 |
Sulfur production plant (Sulfur-2). Off-site facilities, process interconnections and utility networks in JSC “Mozyr Oil Refinery” |
2015 |
|
9 |
Replacement of outdated equipment of APCS of light hydrocracking unit |
2013 |
|
10 |
Reconstruction of solid sulfur open storage |
2013 |
|
11 |
Off-plot facilities for newly constructed units: isomerization; hydrodesulfurization; hydrotreatment; hydrogen production |
2012 |
|
12 |
Modernization of gasoline mixing station |
2011 |
|
13 |
Off-site facilities of monoethanolamine regeneration of sulfur production unit |
2011 |
|
14 |
Automated unit of light-oil products timing loading |
2009 |
|
15 |
ZAO Neftekhimproject Russia |
Hydrocracking complex of vacuum gasoil. Off-plant facilities. JSC "Mozyr Oil Refinery" |
2017 |
16 |
Composite plant for production of high-octane number components of gasoline. Off-plant facilities. |
2011 |
|
17 |
Engine fuel production complex. Off-plant facilities. |
2010 |
|
18 |
Monoethanolamine regeneration unit of Sulfur production plant. Engineering equipment, networks and systems |
2009 |
|
OJSC “Naftan” |
|||
19 |
OJSC “Naftan” |
Construction of storage park and LPG filling rack |
in development |
20 |
Construction of Delayed Coking Unit |
in development |
|
21 |
Modernization of steam supply objects of the production No. 7 |
2017 |
|
22 |
Reconstruction of flare gases return system "GАRO" |
2016 |
|
23 |
Flare System Unit for the unit AT-8 |
2016 |
|
24 |
Construction of the park of additives for diesel fuel 921-08 |
2009 |
|
25 |
STS Integrirani tehnicki servisi d.o.o. Croatia |
Reconstruction of hydro treatment unit L-24/7 of JSC “Naftan” |
2010 |
26 |
Reconstruction of hydro treatment unit LCh-24/7 of JSC “Naftan” |
2010 |
|
27 |
Construction of low temperature isomerization with deizohexanization of JSC “Naftan” |
2008 |
|
28 |
ITP Benelli S.p.A ITP Italy |
Reconstruction of vacuum block of primary oil refining ELOU-AVT-2 OJSC “Naftan” |
2014 |
29 |
Technip Benelux B.V. The Netherlands |
Hydrogen production plant OJSC “Naftan” |
2017 |
30 |
CJSC "Honeywell" Russia |
Gazoline mixing station in commodities shop No.8 OJSC “Naftan” |
2012 |
31 |
Plant "Polymir" JSC "Naftan" |
Reconstruction of internal and external hydrotransport system of the shop 105 and mixing department of the shop 106 |
in development |
32 |
Shop 007. Construction of liquid ammonia storage |
2014 |
|
JSC “Grodno Azot” |
|||
33 |
JSC “Grodno Azot” |
Construction of nitric acid shop with the capacity of 1200 tons per day with the reconstruction of acting production of carbamide-ammonia mixture. Off-plot facilities |
in development |
34 |
Replacement of control, management and ESD system of the shop ammonia-3 with the distributed control system |
2014 |
|
35 |
Experimental and technologic work “Reconstruction of ammonia-4 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop |
2014 |
|
36 |
JSC “Grodno Azot” |
Experimental and technologic work “Reconstruction of ammonia-3 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop |
2014 |
37 |
Recycling of X-oils of the shop of fractionation of cyclohexanone-1 shop. Stage of the recovery of cyclohexanol-rectificate (of the column 534 А/В) of the shop cyclohexanone-1 |
2011 |
|
38 |
Intensification of the stage of benzol distillation of caprolactam-1 shop |
2011 |
|
39 |
Reconstruction of neutralization stage of caprolactam-1 shop |
2011 |
|
40 |
Reconstruction of the unit of cyclohexanonoxima and cyclohexanone stripping from the ammonia sulfate solution of oximation stage of the shop caprolactam-1 |
2011 |
|
41 |
Reconstruction of caprolactam water solution evaporation stage of the shop caprolactam-1 |
2011 |
|
42 |
Reconstruction of cyclohexanol-rectificate recovery unit of the shop cyclohexanone-2 |
2011 |
|
43 |
Reconstruction of distillation stage of caprolactam of caprolactam-1 shop |
2011 |
|
44 |
Construction of steam turbine-generator train with electric power 5,12 Mwatt for the replacement of pressure-reducing cooling stations (PRDS) k.3014 |
2011 |
|
45 |
Reconstruction of the shop for the production of dimethyl ether of fatty acids with the increase of the production up to 30 KTA |
2010 |
|
46 |
Construction of granulated carbamide-6 production shop |
2009 |
|
47 |
Construction of gas-turbine station of cogeneration cycle of second stage (GTPP-16Mwatt, 2х8Mwatt).1st start-up complex |
2009 |
|
48 |
Reconstruction of carbamide-3 shop with the transfer to the release of granulated carbamide |
2009 |
|
49 |
Replacement of control and power supply systems SZhA-3,4 of shop ammonia-3 |
2009 |
|
50 |
Modernization of the control system and emergency protection of ammonia-3 shop |
2008 |
|
51 |
TKIS-RUS Russia |
Construction of the nitric acid shop with the capacity of 1200 ton per day with the reconstruction of existing production of carbamide-ammonia mixture |
2016 |
52 |
Chemieanlagenbau Chemnitz GmbH (CAC) Germany |
Reconstruction of process system No.1 of oleum shop with transfer to short diagram in “JSC “Grodno Azot” |
2016 |
53 |
Koch-Glitsch Italy |
Reconstruction of rectification of the shop cyclohexanone-2 JSC “Grodno Azot" |
2009 |
54 |
AB “BIPROZAT” Poland |
Unit 280 cyclohexane oxidation unit with capacity of 80 000 t/year JSC “Grodno Azot” |
2008 |
JSC “Belshina” |
|||
55 |
JSC “Belshina” |
Main building superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 25" - 29" |
in development |
56 |
Main building of mass tires plant. Overheated water circuits for hydraulic presses of the tunnels No.5 and No. 7 |
2017 |
|
57 |
Main building of superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63. |
2017 |
|
58 |
Main building of superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63. Reconstruction of stock preparation shop |
2016 |
|
59 |
Main building of superlarge overall dimensional tires plant. Reconstruction of stock preparation shop No.1 |
2016 |
|
JSC “Gomel Chemical plant” |
|||
60 |
JSC “Gomel Chemical plant” |
Reconstruction of 2nd section of phosphorus acid shop with bringing up the capacity up to 220 KTA |
2014 |
61 |
Reconstruction of phosphorus acid shop with bringing up the capacity up to 230 KTA |
2011 |
|
62 |
Modernization of the equipment of sulfuric acid shop No.2 (SKC-2) |
2009 |
|
JSC “Mogilevkhimvolokno” |
|||
63 |
JSC “Mogilevkhimvolokno” |
Complex for polyether production. 1st stage of the construction. Reconstruction of chemical shop No.2 of organic synthesis production with the arrangement of polyether fiber by means of direct molding |
in development |
64 |
Process unit for the production of methyl ethers of fatty acids 50000 t/year |
2013 |
|
65 |
Reconstruction of offsite electrical power generating plants. |
2011 |
|
66 |
Needle-punched and thermally bonded nonwoven fabrics production line in the synthetic fiber plant |
2010 |
|
67 |
Unit of continuous polycondensation with the capacity of 80 000 t/year |
2008 |
|
68 |
JSC “Mogilevkhimvolokno” |
Shop for the production of the basis of roofing material |
2008 |
69 |
Unit for the production of high-tenacity yarns of HМ and HMLS types |
2007 |
|
|
State Production Association “Belorusneft” |
|
|
70 |
State Production Association “Belorusneft” |
Complex reconstruction of the Belarusian Gas Processing Plant |
2015 |
71 |
Reconstruction of vapor supply system of the Belarusian Gas Processing Plant |
2015 |
|
72 |
Reconstruction of compressed gas unit of the Belarusian Gas Processing Plant |
2012 |
|
73 |
Construction of ware-raw area No. 2 of the Belarusian Gas Processing Plant |
2009 |
|
74 |
Reconstruction of electric power supply system of process objects of the Belarusian Gas Processing Plant. |
2009 |
|
|
JSC "Mineral Wax Plant" |
|
|
75 |
JSC "Mineral Wax Plant" |
Construction of new and reconstruction of operating productions with the application of modern automated technologies |
2016 |
76 |
AB “Prochem” Poland |
Production of highly purified lampwax with the capacity of 20 000 t/year. JSC “Mineral Wax plant” |
2016 |
|
JSC “Lakokraska” |
|
|
77 |
MAVEG Industrieausrüstungen GmbH, Germany |
Technical re-equipment of phthalic anhydride production with increase of capacity up to 48 thousand tons per year. Construction of the shop of distillation and process train “А” JSC “Lakokraska” |
2016 |
|
Other sites of the Republic of Belarus |
|
|
78 |
JSC “Mozyrsol” |
Modernization of drying shop of main building of salt production |
in development |
79 |
KUP “Kalinovichsky plant for household chemicals” |
Reconstruction of KUP “Kalinovichsky plant for household chemicals” |
2010 |
80 |
RUE “Grodnoobnefteproduct ” |
Reconstruction of oil tank farm |
2013 |
81 |
FLLC “Omsk Carbon Mogilev” Mogilev |
Creation of the enterprise for technical carbon production in free economic area “Mogilev” Mogilev district Mogilev region and railway access to it |
in development |
82 |
RUE "Svetlogorsk Khimvolokno" |
Reconstruction of nonwoven materials shop |
2009 |
83 |
Reconstruction of Arselon fiber production |
2008 |
|
Site outside the Republic of Belarus |
|||
The Republic of Lithuania |
|||
84 |
AB "Achema" |
Revamp of ammonia-2 shop. Implementation of saturation unit of natural gas; ammonia condenser unit in the part of secondary condensation. |
in development |
85 |
Replacement of ammonia heater on the nitrogen acid unit |
2017 |
|
86 |
Modernization of air automation K-500 No.2 of ammonia water shop |
2016 |
|
87 |
Instrumentation system replacement of unit АС-67А of ammonia nitrate |
2016 |
|
88 |
Unit UKL-7 of non-concentrated nitric acid shop. Replacement of fuel valves block of the unit UKL-7 GTT-3/3 М of nonconcentrated nitric acid production. Unit No.3 |
2016 |
|
89 |
Revamp of ammonia production-1 in one set with:
3. "Revamp of process condensate diagram of the shop “Ammonia-1” |
2015 |
|
90 |
Production of nitric acid of the shop GP-2. |
2014 |
|
91 |
Revamp of ammonia unit-1 (АМ-70). Instrumentation and connection of DCS and ESD |
2012 |
|
92 |
UAN production AB “Achema” |
2010 |
|
93 |
Instrumentation system replacement of units UKL-7 No. 3,6 with PCS |
2009 |
|
94 |
Production of non concentrated nitric acid in UKL units No. 7, 8, 9 |
2003 |
|
95 |
UAB “Iremas” Lithuania |
Replacement of Instrumentation system of units No. 1,2 with PCS of carbamide shop” . |
2016 |
The Russian Federation |
|||
96 |
ZAO "Neftekhimproekt" |
Reconstruction of straight-run fuel plant ZPT-450 LLC “Volkhovneftekhim” . Off-plant facilities. |
2016 |
97 |
Off-plot facilities of Hydrogen production plant JSC “Orknefteorgsyntez” |
2014 |
|
98 |
JSC “Acron” Russia |
Replacement of Instrumentation system of nitric acid shop of 1 stage with DCS system |
2009 |
99 |
Research and Production firm “Grace-Engineering” |
Dry gas-dynamic sealing unit for compressors of hydrogen containing gas 2 CD-43/50-64М pos. CK-301 of the unit LK-6U |
2009 |
100 |
JSC "ShchekinoAzot" |
The shop of hexamethylenetetramine, carbamide-formaldehyde concentrate. Technical re-equipping |
2012 |
101 |
Reconstruction of caprolactam production oxidation shop for improvement of TEP |
2011 |
|
102 |
LLC “Design Institute “SGNHP” Salavat Russia |
Catalytic cracking complex with the capacity of 1095 KAT Oil Refinery “Gazprom neftekhim Salavat”. Intermediate park for storage and supply of liquified petroleum gases” |
2016 |
103 |
АО "Phosagro AG" |
Design documentation “Objects of infrastructure of ammonia production with the capacity of 2200 tons per day JSC “Phosagro-Cherepovets” |
2015 |
104 |
Further equipping of convectional area of primary reforming pos.107 by the heat exchanger (recuperative heat exchanger) of natural gas pos.R-1 in the ammonia production shop No.2 |
2014 |
|
105 |
Joint-stock company “Cherepovetsky Azot” Russia |
Technical re-equipment of ammonia production shops No.1 (TEC), and No.2 (AM-76) |
2012 |
106 |
Balakovsky branch of Joint-stock company “Phosagro AG” Russia |
Construction of NPK fertilizers production with the capacity of 450 KAT in LLC “BMU” (Balakovsky plant of mineral fillings) |
2014 |
107 |
АО NAK"Azot" |
Technical re-equipment of SAC section of the shop of nitric acid production with the creation of automated control system APCS |
in development |
108 |
Replacement of the control system of Borsig compressor in the shop Carbamide-2 |
2014 |
|
109 |
Technical re-equipment of ammonia nitrate shop MUiK No.1 with the transfer to PCS |
2012 |
|
110 |
Replacement of the control system of nitric acid separation of the shop MUiK No. 1 with automatic control system of technological process |
2009 |
|
111 |
JSC "Nevinnomyssky Azot" |
Technical re-equipment of APCS and PAZiS system of vinyl acetate production in the shop No. 12 |
in development |
112 |
Technical re-equipment of automatic process control system (APCS) of the shop No.12А |
2017 |
|
113 |
Creation of the system of control and emergency protection over air and nitric compressors of the shop No.11 PRV, ZHUiOA |
2015 |
|
114 |
Creation of APCS in the section of acetic aldehyde of the shop No.9 |
2014 |
|
115 |
JSC "Nevinnomyssky Azot" |
Technical re-equipment of APCS UTO of the shop No.12 with the application of microprocessor technology and the transfer of central processing unit from the building 819 to the building 821 |
2013 |
116 |
Modernization of Instrumentation means with implementation of PCS of complex mineral fertilizers production shop No.18 |
2010 |
|
117 |
LLC "Scientific and technological center" Khimazot " |
Technical re-equipment of UKL-7-76 for the production of nitric acid based on the selective treatment of tail gases” JSC “Meleuzovskie mineral fertilizers” |
2014 |
118 |
Technical re-equipment of tail gases treatment with the transfer to the selective treatment of the section 5-A of the shop MUiK No. 1 |
2011 |
|
119 |
Waste disposal of nitrous gases of nitric acid (KAK) of the shop MUiK No.2 “NAK Azot” |
2010 |
|
120 |
Technical re-equipment of the unit UKL-7 No.3 with the unit GTU-8 and evaporative system of air cooling at discharge GTU-8 in the shop No.5 of nitric acid production |
2009 |
|
121 |
Technical re-equipment of nitrous gases preparation stage of the unit AK-72 М |
2009 |
|
122 |
Technical re-equipment of the nitrous gases preparation stage in the unit AK-72 |
2009 |
|
123 |
ITC"Himazot-SPB" |
Technical re-equipment of the stage of recuperative heating of tail gases before the reactor of selective treatment of the unit UKL-7-76 No.8 for the production of nitric acid in JSC “PhosAgro-Cherepovets” |
2016 |
124 |
Working documentation for the replacement of existing Instrumentation means of ammonia evaporation unit for units UKL 7-76 No.1, 3 and the unit of steam supply to UKST for the unit No.1 in JS “Meleuzovsky mineral fertilizers” |
2015 |
|
125 |
Technical re-equipment of units UKL-7-76 No. 1, 3 for the nitric acid production on the basis of selective catalityc treatment of tail gases” on LLC “Mendeleevskazot” |
2014 |
|
126 |
CJSC "Honeywell" Russia |
Modernization of the production of Astrakhan Gas Processing Production for the purpose of production of motor fuels of 4th, 5th classes |
2014 |
127 |
JSC "KuibyshevAzot" Russia |
Polyamide-6 production plant. |
2016 |
128 |
JSC "KuibyshevAzot" Russia |
Ammonia production. Technical re-equipment of Instrumentation system without the alteration of the process part of the project |
2008 |
129 |
JSC “Tulagiprokhim” Russia |
Documentation for the section of production engineering automation for the object “Technical re-equipment of units UKL-7 No.1-9 with the unit GTU-8 in the section of non concentrated nitric acid of the shop MUiK No.1 in JSC “NAK “Azot”. Unit No.5. |
2015 |
130 |
IPS “Invensys Process Systems” Russia |
Replacement of Instrumentation system of unified standard lines 7-71/76 UKL (3 units) and general shop measurement of the shop of SAK JSC “Dorogobuzh” with APCS |
2012 |
131 |
JSC “Dorogobuzh”" Russia |
Documentation for replacement of Instrumentation system (instrumentation and automated control systems) of units AK-72 (2 units) and general shop measurement of the shop of SAK (weak nitric acid) to APCS (process control system) |
2016 |
132 |
JSC “TIAP” Russia |
Technical re-equipment of the control system of ammonia unit No.6 in JSC “TogliattiAzot” (unit AM-76). 1st stage, videlicet – Technical assignment for APCS and main technical decisions |
2014 |
133 |
JSC “Acron” Russia |
Replacement of the Instrumentation system of nitric acid shop 1 stage with PCS system |