Projects of Previous Years

No.

Customer

Services

Year of performance

1

STS Integrirani tehnicki servisi d.o.o. Croatia

Reconstruction of hydro treatment unit L-24/7

2010

2

STS Integrirani tehnicki servisi d.o.o. Croatia

Reconstruction of hydro treatment unit LCh-24/7

2010

3

STS Integrirani tehnicki servisi d.o.o. Croatia

Construction of low temperature isomerization with deizohexanization

2008

4

Koch-Glitsch Italy

Reconstruction of rectification of the shop cyclohexanone-2 JSC “Grodno Azot"

2009

5

ITP Benelli S.p.A ITP

Italy

Reconstruction of vacuum block of primary oil refining ELOU-AVT-2 JSC “Naftan”

2014

6

MAVEG

Industrieausrüstungen

GmbH, Germany

Technical re-equipment of phthalic anhydride production with increase of capacity up to 48 thousand tons per year.

Construction of the shop of distillation and process train “А” at the address Lida, Ignatova Str., 71, JSC “Lakokraska”

2016

7

Chemieanlagenbau

Chemnitz GmbH

(CAC) Germany

Reconstruction of process system No.1 of oleum shop with transfer to short diagram in “JSC “Grodno Azot”

2016

8

Technip Benelux B.V. The Netherlands

Hydrogen production plant JSC “Naftan”

2017

9

AB “BIPROZAT” Poland

Unit 280 cyclohexane oxidation unit with capacity of 80 000 t/year JSC “Grodno Azot”

2008

10

AB “Prochem” Poland

Construction of production of highly purified lampwax, oils, lubricants, coolant-cutting fluid, model compositions with reconstruction of power complex”. JSC “Mineral Wax plant” Ist stage of construction: production of highly purified lampwax with the capacity of 20 000 t/year.

2016

11

AB “Achema” Lithuania

UAN production AB “Achema”

2010

12

AB “Achema” Lithuania

Instrumentation system replacement of units UKL-7 No. 3,6 with PCS

2009

13

AB “Achema” Lithuania

Revamp of ammonia unit-1 (АМ-70). Instrumentation and connection of DCS and ESD

2012

14

AB “Achema” Lithuania

Replacement of ammonia heater Н202 on the nitrogen acid unit

2017

15

AB “Achema” Lithuania

Modernization of air automation K-500 No.2 of ammonia water shop

2016

16

AB “Achema” Lithuania

Revamp of ammonia production-1 in one set with:

1. "Revamp of air compressor pos. 402";

2. "Revamp of natural gas compressor pos. 403, installation of dry sealing and pressure reduction spool";

3.  "Revamp of process condensate diagram of the shop “Ammonia-1”

2015

17

AB “Achema” Lithuania

Instrumentation system replacement of unit АС-67А of ammonia nitrate

2016

18

AB “Achema” Lithuania

Unit UKL-7 of non-concentrated nitric acid shop. Replacement of fuel valves block of the unit UKL-7 GTT-3/3 М of nonconcentrated nitric acid production. Unit No.3

2016

19

AB “Achema” Lithuania

Production of nitric acid of the shop GP-2. Performed parts of the project

2014

20

AB “Achema” Lithuania

Revamp of ammonia-2 shop. Implementation of saturation unit of natural gas; ammonia condenser unit in the part of secondary condensation.

In development

21

UAB “Iremas” Lithuania

Replacement of Instrumentation system of units No. 1,2 with PCS of carbamide shop” . Performed scope of works:

production engineering automation

2016

22

JSC “Acron” Russia

Replacement of Instrumentation system of nitric acid shop of 1 stage with DCS system

2009

23

Research and

Production firm

“Grace-Engineering”

Dry gas-dynamic sealing unit for compressors of hydrogen containing gas 2 CD-43/50-64М pos. CK-301 of the unit LK-6U

2009

24

United Chemical Company

“Shchekinoazot”

Assessment of technical possibility of cyclohexanone unit construction 80 KTA

2008

25

United Chemical Company

“Shchekinoazot”

Technical recommendations for arrangement of equipment of revamped shop of caprolactam production oxidation

2010

26

United Chemical Company

“Shchekinoazot”

Reconstruction of caprolactam production oxidation shop for improvement of TEP

2011

27

United Chemical Company

“Shchekinoazot”

Assessment of accommodation possibility of “Caprolactam production with capacity 100 KTA” on the site of JSC “Shchekinoazot” and adjacent territories

2011

28

United Chemical Company

“Shchekinoazot”

The shop of hexamethylenetetramine, carbamide-formaldehyde concentrate. Technical re-equipping

2012

29

LLC “Design Institute

“SGNHP” Salavat Russia

Catalytic cracking complex with the capacity of 1095 KAT Oil Refinery “Gazprom neftekhim Salavat”. Intermediate park for storage and supply of liquified petroleum gases”

2016

30

Joint-stock company

“Cherepovetsky Azot” Russia

Technical re-equipment of ammonia production shops No.1 (TEC), and No.2  (AM-76)

2012

31

Joint-stock company “Phosagro” AG” Russia

Further equipping of convectional area of primary reforming pos.107 by the heat exchanger (recuperative heat exchanger) of natural gas pos.R-1 in the ammonia production shop No.2

2014

32

Balakovsky branch of

Joint-stock company “Phosagro” AG” Russia

Construction of NPK fertilizers production with the capacity of 450 KAT in LLC “BMU” (Balakovsky plant of mineral fillings)

2014

33

Joint-stock company

NAK “Azot” Russia

Replacement of the control system of nitric acid separation of the shop MUiK No. 1 with automatic control system of technological process

2009

34

Joint-stock company

NAK “Azot” Russia

Technical re-equipment of ammonia nitrate shop MUiK No.1 with the transfer to PCS

2012

35

Joint-stock company

NAK “Azot” Russia

Replacement of the control system of Borsig compressor in the shop Carbamide-2

2014

36

Joint-stock company

NAK “Azot” Russia

Technical re-equipment of SAC section of the shop of nitric acid production with the creation of automated control system

APCS

in development

37

JSC "Nevinnomyssky Azot" Russia

Modernization of Instrumentation means with implementation of PCS of complex mineral fertilizers production shop No.18

2010

38

JSC "Nevinnomyssky Azot" Russia

Engineering documentation of the installation of process flows expenditure records units with the output of the unit readings to ADCS for ammonia product balances, ammonia nitrate fusion, steam 10, steam 20, steam 30, air and nitrogen

2012

39

JSC "Nevinnomyssky Azot" Russia

Creation of APCS in the section of acetic aldehyde of the shop No.9

2014

40

JSC "Nevinnomyssky Azot" Russia

Technical re-equipment of APCS UTO of the shop No.12 with the application of microprocessor technology and the transfer of central processing unit from the building 819 to the building 821

2013

41

JSC "Nevinnomyssky Azot" Russia

Technical re-equipment of APCS and PAZiS system of vinyl acetate production in the shop No. 12

in development

42

JSC "Nevinnomyssky Azot" Russia

Technical re-equipment of automatic process control system (APCS)  of the shop No.12А

2017

43

JSC "Nevinnomyssky Azot" Russia

Creation of the system of control and emergency protection over air and nitric compressors of the shop No.11 PRV,

ZHUiOA

2015

44

TKIS-RUS Russia

Construction of the nitric acid shop with the capacity of 1200 ton per day with the reconstruction of existing production of carbamide-ammonia mixture

2016

45

LLC “Research And

Development Center

“Himazot” Russia

Technical re-equipment of the nitrous gases preparation stage in the unit AK-72

2009

46

LLC “Research And

Development Center

“Himazot” Russia

Technical re-equipment of tail gases treatment with the transfer to the selective treatment  of the section 5-A of the shop

MUiK No. 1

2011

47

LLC “Research And

Development Center

“Himazot” Russia

Technical re-equipment of the unit UKL-7 No.3 with the unit GTU-8 and evaporative system of air cooling at discharge GTU-8 in the shop No.5 of nitric acid production

2009

48

LLC “Research And

Development Center

“Himazot” Russia

Technical re-equipment of nitrous gases preparation stage of the unit AK-72 М

2009

49

LLC “Research And

Development Center

“Himazot” Russia

Waste disposal of nitrous gases of nitric acid (KAK) of the shop MUiK No.2 “NAK Azot”

2010

50

LLC “Research And

Development Center

“Himazot” Russia

Technical re-equipment of UKL-7-76 for the production of nitric acid based on the selective treatment of tail gases” JSC

“Meleuzovskie mineral fertilizers”

2014

51

Research And

Development Center

“Himazot-SPb” Russia

Technical re-equipment of the stage of recuperative heating of tail gases before the reactor of selective treatment of the unit

UKL-7-76 No.8 for the production of nitric acid in JSC “PhosAgro-Cherepovets”

2016

52

Research And

Development Center

“Himazot-SPb” Russia

Working documentation for the replacement of existing Instrumentation means of ammonia evaporation unit for units UKL 7-76 No.1, 3 and the unit of steam supply to UKST for the unit No.1 in JS “Meleuzovsky mineral fertilizers”

2015

53

Research And

Development Center

“Himazot-SPb” Russia

Technical re-equipment of units UKL-7-76 No. 1, 3 for the nitric acid production on the basis of selective catalityc treatment of tail gases” on LLC “Mendeleevskazot”

2014

54

CJSC

"Neftekhimproekt" Russia

Monoethanolamine regeneration unit of Sulfur production plant. Engineering equipment, networks and systems JSC “Mozyr

Oil Refinery”

2009

55

CJSC

"Neftekhimproekt" Russia

Engine fuel production complex. Off-plant facilities.

2010

56

CJSC

"Neftekhimproekt" Russia

Reconstruction of straight-run fuel plant ZPT-450 LLC “Volkhovneftekhim” . Off-plant facilities.

2016

57

CJSC

"Neftekhimproekt" Russia

Off-plot facilities of Hydrogen production plant JSC “Orknefteorgsyntez”

2014

58

CJSC

"Neftekhimproekt" Russia

Composite plant for production of high-octane number components of gasoline JSC “Mozyr Oil Refinery”. Off-plant facilities.

2011

59

CJSC

"Neftekhimproekt" Russia

Hydrocracking complex of vacuum gasoil. Off-plant facilities.  JSC "Mozyr Oil Refinery"

2017

60

CJSC "Honeywell" Russia

Gazoline mixing station in commodities shop No.8 JSC “Naftan”

2012

61

CJSC "Honeywell" Russia

Modernization of the production of Astrakhan Gas Processing Production for the purpose of production of motor fuels of 4th,

5th classes

2014

62

JSC "KuibyshevAzot" Russia

Ammonia production. Technical re-equipment of Instrumentation system without  the alteration of the process part of the project

2008

63

JSC "KuibyshevAzot" Russia

Polyamide-6 production plant. 4th stage of construction

2016

64

JSC “Tulagiprokhim” Russia

Documentation for the section of production engineering automation for the object “Technical re-equipment of units UKL-7 No.1-9 with the unit GTU-8 in the section of non concentrated nitric acid of the shop MUiK No.1 in JSC “NAK “Azot”.

Unit No.5. Integration ACS GTU-8 in existing APCS of the shop

2015

65

IPS “Invensys Process

Systems” Russia

Replacement of Instrumentation system of unified standard lines 7-71/76 UKL (3 units) and general shop measurement of the shop of SAK JSC “Dorogobuzh” with APCS

2012

66

JSC “Dorogobuzh”" Russia

Documentation for replacement of Instrumentation system (instrumentation and automated control systems) of units AK-72 (2 units) and general shop measurement of the shop of SAK (weak nitric acid) to APCS (process control system)

2016

67

JSC “TIAP” Russia

Technical re-equipment of the control system of ammonia unit No.6 in JSC “TogliattiAzot” (unit AM-76). 1st stage, videlicet – Technical assignment for APCS and main technical decisions

2014

68

JSC “Acron” Russia

Replacement of the Instrumentation system of nitric acid shop 1 stage with PCS system

2009

69

JSC “Gaspromneft – MNPZ” Russia

Reconstruction of the section of automated station of gasoline and boiler fuel mixing station ASSB and KT of the shop No.8

in development

70

JSC “Belgorkhimprom”

Phthalic anhydride production. Technical re-equipment. JSC “Lakokraska”, Lida.

2009

71

JSC "Mozyr Oil Refinery"

Modernization of gasoline mixing station

2011

72

JSC "Mozyr Oil Refinery"

Reliability enhancement of electrical power supply of JSC “Mozyr Oil Refinery”. Reconstruction of GPP-110/6 kv “Emergency”, “treatment utilities”, water-diverting structure.

2009

73

JSC "Mozyr Oil Refinery"

Off-plot facilities for newly constructed units: isomerization; hydrodesulfurization; hydrotreatment; hydrogen production

2012

74

JSC "Mozyr Oil Refinery"

Automated unit of light-oil products timing loading

2009

75

JSC "Mozyr Oil Refinery"

Development of plot plan as a Designer

2016

76

JSC "Mozyr Oil Refinery"

Reconstruction of VTP system of tank batteries of the section of dark oil products of the shop No.5

2016

77

JSC "Mozyr Oil Refinery"

Replacement of outdated equipment of APCS of light hydrocracking unit

2013

78

JSC "Mozyr Oil Refinery"

Modernization of pipe rack title 21/9 for the discharge of oil raw

2012

79

JSC "Mozyr Oil Refinery"

Modernization of switchgear RU-6 kv PTP-3 of the unit LK-6U No. 2.

2009

80

JSC "Mozyr Oil Refinery"

Reconstruction of fire alarm of the shop No. 14

2009

81

JSC "Mozyr Oil Refinery"

Reconstruction of solid sulfur open storage

2013

82

JSC "Mozyr Oil Refinery"

Local annunciation system at emergency situations in JSC “Mozyr Oil Refinery”

2013

83

JSC "Mozyr Oil Refinery"

Modernization of recycling water supply unit BOV-3

2009

84

JSC "Mozyr Oil Refinery"

Off-site facilities of monoethanolamine regeneration of sulfur production unit

2011

85

JSC "Mozyr Oil Refinery"

Reconstruction of inert gas unit (Nitric-acid station) of the shop No.12

2016

86

JSC "Mozyr Oil Refinery"

Construction of new regional condensate station in the shop No.5 commodities

2017

87

JSC "Mozyr Oil Refinery"

Sulfur production plant (Sulfur-2). Off-site facilities, process interconnections and utility networks in JSC “Mozyr Oil

Refinery”

2015

88

JSC "Mozyr Oil Refinery"

Interconnections of diesel fuel park title 21/2-6

2015

89

JSC "Mozyr Oil Refinery"

Sulfur-alkali wastes utilization unit of the shop No.10

in development

90

JSC "Mozyr Oil Refinery"

Hydrocracking complex of heavy petroleum residues. Off-plant facilities

in development

91

JSC "Mozyr Oil Refinery"

Replacement of (modernization) of pipelines, worked out 25 years and more

2016

92

JSC "Mozyr Oil Refinery"

Design of utility networks and systems of JSC “Mozyr Oil Refinery” for the period of 2013-2017

in development

93

JSC “Mozyrsol”

Modernization of drying shop of main building of salt production

in development

94

KUP “Kalinovichsky plant for household chemicals”

Reconstruction of KUP “Kalinovichsky plant for household chemicals”

2010

95

JSC "Belshina"

Main building of mass tires plant. Overheated water circuits for hydraulic presses of the tunnels No.5 and No. 7

in development

96

JSC "Belshina"

Main building superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63"

in development

97

JSC "Belshina"

Main building of superlarge overall dimensional tires plant. Creation of solid metal cord tires production of radial design with rim diameter 57" - 63. Reconstruction of stock preparation shop

2016

98

RUE

“Grodnoobnefteproduct

Reconstruction of oil tank farm

2013

99

JSC “Borisov plastic products plant”

Reconstruction of the section of the press shop with arrangement of household products at Daumana Street, Borisov

2014

100

JSC "Gomel Chemical Plant"

Reconstruction of phosphorus acid shop with bringing up the capacity up to 230 KTA

2011

101

JSC "Gomel Chemical Plant"

Reconstruction of 2nd section of phosphorus acid shop with bringing up the capacity up to 220 KTA

2014

102

JSC "Gomel Chemical Plant"

Modernization of the equipment of sulfuric acid shop No.2 (SKC-2)

2009

103

JSC "Grodno Azot"

Modernization of the control system and emergency protection of ammonia-3 shop

2008

104

JSC "Grodno Azot"

Construction of granulated carbamide-6 production shop

2009

105

JSC "Grodno Azot"

Construction of GTPP of 2nd stage 16 Mwatt

2009

106

JSC "Grodno Azot"

Production of caprolactam-1. Cyclohexane unit 80 KTA

2009

107

JSC "Grodno Azot"

Construction of gas-turbine station of cogeneration cycle of second stage (GTPP-16Mwatt, 2х8Mwatt).1st start-up complex

2009

108

JSC "Grodno Azot"

Reconstruction of VOC-1 with the separation to 2 independent cycles of consumers supply: oxidizer of cyclohexanone-1 and carbamide-1 shop

2009

109

JSC "Grodno Azot"

Reconstruction of carbamide-3 shop with the transfer to the release of granulated carbamide

2009

110

JSC "Grodno Azot"

Replacement of control, management and ESD system of the shop ammonia-3 with the distributed control system

2014

111

JSC "Grodno Azot"

Reconstruction of water demineralization section of boiler shop

2008

112

JSC "Grodno Azot"

Replacement of control and power supply systems СЖА-3,4 of shop ammonia-3

2009

113

JSC "Grodno Azot"

Recycling of Х-oils of the shop of fractionation of cyclohexanone-1 shop. Stage of the recovery of cyclohexanol-rectificate (of the column С534 А/В) of the shop cyclohexanone-1

2011

114

JSC "Grodno Azot"

Intensification of the stage of benzol distillation of caprolactam-1 shop

2011

115

JSC "Grodno Azot"

Reconstruction of neutralization stage of caprolactam-1 shop

2011

116

JSC "Grodno Azot"

Reconstruction of the unit of cyclohexanonoxima and cyclohexanone stripping from the ammonia sulfate solution of oximation stage of the shop caprolactam-1

2011

117

JSC "Grodno Azot"

Reconstruction of caprolactam water solution evaporation stage of the shop caprolactam-1

2011

118

JSC "Grodno Azot"

Reconstruction of cyclohexanol-rectificate recovery unit of the shop cyclohexanone-2

2011

119

JSC "Grodno Azot"

Reconstruction of distillation stage of caprolactam of caprolactam-1 shop

2011

120

JSC "Grodno Azot"

Construction of steam turbine-generator train with electric power 5,12 Mwatt for the replacement of pressure-reducing cooling stations (PRDS) k.3014

2011

121

JSC "Grodno Azot"

Reconstruction of electrical supply networks of the substation 44 OPSV

2013

122

JSC "Grodno Azot"

Construction of nitric acid shop with the capacity of 1200 tons per day with the reconstruction of operating carbamideammonia mixture production. Off-plant facilities

in development

123

JSC "Grodno Azot"

Experimental and technologic work “Reconstruction of ammonia-4 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop

2014

124

JSC "Grodno Azot"

Experimental and technologic work “Reconstruction of ammonia-3 shop with the increase of the capacity and the decrease of power consumption. The development of technological processes model of the shop

2014

125

JSC "Mineral Wax Plant"

Construction of new and reconstruction of operating productions with the application of modern automated technologies

2016

126

JSC

"Mogilevkhimvolokno"

Organic synthesis plant. PET storage warehouse

2008

127

JSC

"Mogilevkhimvolokno"

Reconstruction of offsite electrical power generating plants.

2011

128

JSC

"Mogilevkhimvolokno"

Needle-punched and thermally bonded nonwoven fabrics production line in the synthetic fiber plant

2010

129

JSC

"Mogilevkhimvolokno"

Polyether production complex in JSC "Mogilevkhimvolokno" Schmidt Avenue Mogilev. First stage of construction. Reconstruction of chemical shop No.2 of organic synthesis production with the arrangement of polyether fiber by means of direct molding

in development

130

FLLC “Omsk Carbon

Mogilev” Mogilev

Creation of the enterprise for technical carbon production in free economic area “Mogilev” Mogilev disctrict Mogilev region and railway access to it

in development

131

State Production

Association

"Belorusneft"

Complex reconstruction of the Belarusian Gas Processing Plant

2015

132

State Production

Association

"Belorusneft"

Reconstruction of vapor supply system of the Belarusian Gas Processing Plant

2015

133

State Production

Association

"Belorusneft"

Construction of ware-raw area No. 2 of the Belarusian Gas Processing Plant

2009

134

State Production

Association

"Belorusneft"

Reconstruction of electric power supply system of process objects of the Belarusian Gas Processing Plant.

2009

135

State Production

Association

"Belorusneft"

Reconstruction of boiler room of the Belarusian Gas Processing Plant

2010

136

State Production

Association

"Belorusneft"

Reconstruction of compressed gas unit of the Belarusian Gas Processing Plant

2012

137

OJSC "Naftan"

Modernization of steam supply objects of the production No. 7

2017

138

OJSC "Naftan"

Construction of the park of additives for diesel fuel 921-08

2009

139

OJSC "Naftan"

Construction of storage park and LPG filling rack

in development

140

OJSC "Naftan"

Shop 020. Reconstruction of secondary radial subsiding tank No. 42

2010

141

OJSC "Naftan"

Modernization of condensate stations

in development

142

OJSC "Naftan"

Wastes advanced treatment unit by means of floatation

2009

143

OJSC "Naftan"

Control room of the unit L-24/7, LCh-24/7

2009

144

OJSC "Naftan"

Reconstruction of flare gases return system

2016

145

OJSC "Naftan"

Construction of fire fighting water system for the object located in preindustrial area

2009

146

OJSC "Naftan"

Reconstruction of 2nd system of return water supply

2015

147

OJSC "Naftan"

Construction of rail road-track scale

in development

148

OJSC "Naftan"

Reconstruction of railway overpass 910-100

in development

149

OJSC "Naftan"

Flare System Unit for the unit AT-8

2016

150

The plant Polymir of JSC Naftan

Shop 007. Construction of liquid ammonia storage

2014

151

The plant Polymir of JSC Naftan

Reconstruction of internal and external hydrotransport system of the shop 105 and mixing department of the shop 106

in development

152

RUE

“SvetlogorskoeKhimvo lokno”

Reconstruction of Arselon fiber production

2008

153

RUE

“SvetlogorskoeKhimvo lokno”

Reconstruction of nonwoven materials shop

2009

154

JLLC “SP BNK group invest”

Manufacturing unit for hydrocarbon raw material processing in Dubrova village Svislotch disctrict

2009

155

JSC “VILARIS”

Oil products transfer point in Bruzgi village Grodno district. Reconstruction.

2008